![]() ![]() See the Mumbai Metro page for a future network map with Line-10 and Line-11’s general route. Green Line’s under construction Line-4 and Line-4A with all stations have been mapped out below. Estimated Daily Ridership: 16.95 lakh/day (2031, CSMT – Gaimukh).Detailed Project Report (DPR): view here (prepared by DMRC in Sept 2018).Station Names: Wadala RTO, Ganesh Nagar, BPT Hospital, Sewri, Hay Bunder, Coal Bunder, Darukhana, Wadi Bunder, Clock Tower, Carnac Tower and CSMT.Type: Elevated & Underground (8.765 km).Green Line – Line-11: Bhakti Park (Wadala) – CSMT (12.774 km) Estimated Daily Ridership: 4.66 lakh/day (2031).Detailed Project Report (DPR): view here (prepared by DMRC in March 2019).Station Names: Gaimukh Reti Bundar, Versova Chaar Phata, Kashi Mira, Shivaji Chowk.Green Line – Line-10: Gaimukh – Shivaji Chowk (Mira Road) Detailed Project Report (DPR): view here (prepared by DMRC in Oct 2017).Green Line – Line-4A: Kasaravadavali – Gaimukh Estimated Daily Ridership: 13.43 lakh/day (2031, Gaimukh – Wadala).Stations Names: Bhakti Park, Wadala TT, Anik Bus Depot, Suman Nagar, Siddharth Colony, Amar Mahal Junction, Garodia Nagar, Pant Nagar, Lakshmi Nagar, Shreyas Cinema, Godrej Company, Vikhroli, Surya Nagar, Gandhi Nagar, Naval Housing, Bhandup Mahapalika, Bhandup, Shangrila, Dr Hedgewar Chowk, Mulund Fire Station, Maharana Pratap Chowk, Thane Teen Haath Naka, RTO Thane, Mahapalika Marg, Cadbury Junction, Majiwada, Kapurbawdi, Manpada, Tikuji-Ni-Wadi, Dongari Pada, Vijay Garden, Kasaravadavali.Depot: Vikhroli (Godrej) – 15.50 hectares.Green Line – Line-4: Bhakti Park (Wadala) – Kasaravadavali ![]() Mumbai’s Green Line is being developed in four sections or parts –
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |